Completed
Renovation of Al-Azhar Mosque, Mashyakha & Islamic Mission city ,Universities & student dorms.
Client
Al-Azhar Alsharif –Ministries of Construction and Religious Endowments -Ministry of State for Antiquities
Consultant
Dar Alhandasah Shair & Partners
Start Date
November 2014
End Date
June 2018
Project Description
Renovation of Al-Azhar Mosque, Mashyakha & Islamic mission city –Al-Azhar university buildings, institutions and student dorms project.
Scope of work includes 10 Major projects as follows: -
1. Rehabilitation of Al-Azhar Mosque
2. Rehabilitation of Al-Azhar Sheikhdom (Mashyakha) Facing Mosque to Be Residency for Senior Scientists, The Building Consists Of 5 Floors (Basement, Ground Floors,3 Raised Floors With 2 Main Entrances)
3. Distribution Of 20 Buildings of Existing Islamic Mission City.
4. Development of Laboratories in Al-Azhar Institutions (200 Laboratories).
5. Development of Al Azhar Al Sharif Press Complex
6. Design and Construct for Al-Azhar Channel Works That Includes 2 Studios and Panorama Studio highly Equipped, Plus Supporting Places Like Offices Parking Lighting Montage Services Guests Saloons with Area 16,600sqm.
7. Rehabilitation For 3 Kitchens Equipment, Expansion for Nasr City Azhar University Kitchen B and Development for Elevators and Kitchens Water Closets.
8. Construction for Student Dorms in Tanta Consists Of (Ground +4 Repeated Floors)
9. Construction of Two Separate Buildings for Faculties of Dentistry and Pharmacy for Girls at Al-Azhar University in Cairo with Total BUA for each 20,500 Sqm.
- Faculty of Dentistry Accommodates =1500 Students.
- Faculty of Pharmacy Accommodates =2250 Students.
10. Construction of Two Separate Buildings for Faculties of Dentistry and Pharmacy for Girls at Al-Azhar University in Luxor with Total BUA for each 9,000 Sqm.
- Faculty of Dentistry Accommodates =500 Students.
- Faculty of Pharmacy Accommodates =750 Students