Medical

Completed

New National Cancer Institute 500 500 Hospital- El Sheikh Zayed City

Client

The New National Cancer Institute

Consultant

Skidmore, Owings & Merrill LLP (SOM)

Start Date

May 2018

End Date

February 2021

Contract Value

648 Million EGP

Project Description

 

Construction of a building consisting of 4 basements, ground floor, 5 floors & two roof levels.  With a total built up area of approximately 67,000m2.

The scope of construction work includes the following:

  • Foundation works inclusive of earthwork, dewatering, soil replacement, waterproofing, reinforced concrete.
  • Structure skeleton inclusive of reinforced concrete works and structural steel works.
  • Building envelope that is composed of a number of façade types including glass curtain wall, precast concrete panels, walls with different types of finish, windows, doors & canopies.
  • Roof treatment: moisture & thermal insulation
  • MEP works embedded in structure
  • Earthing & lightening protection system components embedded in the structural elements
  • Delivery/handling of material directed by the employer and/or donors
  • Any temporary works needed for the safety of existing structures & roads stability.