Projects

Projects

Projects page brief.
New Ball Room – Fairmont Hotel

New Ball Room – Fairmont Hotel

Fit Out & MEP Works Of the Heliopolis Hotel Cairo New Ballroom Extension Located Between Existing Hotel & New Hotel Building, Consists Of 3 Floors (Basement, Mezzanine and Ground).

Entrance Area Works  Including All Internal Finishes, EM Services, Canopy Cladding and External Landscaping.

Completed
Read More
Magdy Yacoub Heart Foundation – 6th October City

Magdy Yacoub Heart Foundation – 6th October City

The scope of work comprises the execution, completion and remedying of defects of the works of site enabling, grading, excavation and foundation

Completed
Read More
Al Rehab Residential Compound Roads& Utilities for Phases 1 & 2

Al Rehab Residential Compound Roads& Utilities for Phases 1 & 2

  • Construction of 365 Residential Buildings and 500 Villas with various Architectural Types.
  • Utilities & site development works that Includes Road Works, Water Supply, Sewage System, Power Distribution System and Telephone Networks.
  • Construction of El Rehab Shopping Mall 1 & Club.
Completed
Read More
TBL And Apron Commercial Exploitation for Alexandria International irport (Nozha Airport)

TBL And Apron Commercial Exploitation for Alexandria International irport (Nozha Airport)

The scope of work includes repair works and raising efficiency for old existing building with total BUA 4000 Sqm. consists of 3 floors, with construction of new concrete one floor building as an extension of old one.

Completed
Read More
Al Rehab Shopping Mall

Al Rehab Shopping Mall

Construction of Al Rehab shopping mall 1 consisting of shops, cinemas and restaurants

Completed
Read More
Al Rehab Club

Al Rehab Club

Construction of the club building, along with its Playgrounds & Fences

Completed
Read More
Dream Land Residential Compound Dream Land Mall

Dream Land Residential Compound Dream Land Mall

Construction and finishing of mega shopping center consisting of a pavilion, retail building, gateway and utilities.

Completed
Read More
Cairo International Airport Automated People Mover (APM)

Cairo International Airport Automated People Mover (APM)

Cairo Airport Automated People Mover is the first of its kind in the Middle East, the Train was built for free service in the airport for the transit passengers and the general public to use within the airport grounds, connecting TB1 (Terminal 1), Air Mall, Car Park, TB2 (Terminal 2), until TB3 (Terminal 3) within 5 minutes maximum.
The train's route length is 1857 meters. The Capacity of the train is 2000 Passengers per hour per direction. The number of trains in the service is 2 trains, and the number of vehicles in each train is 3 vehicles, the number of passengers 170 passengers and operating time 18 hours a day, and six hours of maintenance

 


 

Completed
Read More
Renovation Of  Cairo Int. Airport Terminal Building #1 Transit Hall

Renovation Of Cairo Int. Airport Terminal Building #1 Transit Hall

Renovation works in transit hall Terminal # 1 for VIP lounges, upgrade for: (restaurant, stereo & air lounges), (American- French – Italian & English) saloons, w/c for transit hall terminal # 1, increasing the efficiency of the a/c, upgrading & finishing for the bus bridge & the façade of main building & hotel.

Completed
Read More