Construction of New Terminal Building at Sharm El Sheikh Airport
Construction of The New Terminal Building at Sharm El Sheikh Airport with a total built up area of about 44,000 Sqm. In Addition to an Electromechanical Plant, Control Building and Associated External Site Works.
Completed
Read MoreHeliopolis Sporting Club Swimming Pools & Changing Rooms
Construction of The Swimming Pools Area (Olympic Diving, Recreation Facilities, Children Pools, Changing Room building), in addition to Two Coffee Shops Along with Site Landscape & Hardscape Works.
Completed
Read MoreNew National Cancer Institute 500 500 Hospital- El Sheikh Zayed City
Construction of a building consisting of 4 basements, ground floor, 5 floors & two roof levels. With a total built up area of approximately 67,000m2.
Completed
Read MoreLe Meridien - Cairo Int. Airport 5 stars hotel
Construction Finishing and Electromechanical Works of a 5 Stars Hotel Connected to Cairo Int. Airport Terminal Building 3 (Tb3) Through an Air-Conditioned Skyway.
With Built Up Area 37,000 Sqm. Comprises Of 7 Floors Including Ground Floor And 1st Floor Below Ground Level
Completed
Read MoreNew Ball Room – Fairmont Hotel
Fit Out & MEP Works Of the Heliopolis Hotel Cairo New Ballroom Extension Located Between Existing Hotel & New Hotel Building, Consists Of 3 Floors (Basement, Mezzanine and Ground).
Entrance Area Works Including All Internal Finishes, EM Services, Canopy Cladding and External Landscaping.
Completed
Read MoreMagdy Yacoub Heart Foundation – 6th October City
The scope of work comprises the execution, completion and remedying of defects of the works of site enabling, grading, excavation and foundation
Completed
Read MoreAl Rehab Residential Compound Roads& Utilities for Phases 1 & 2
- Construction of 365 Residential Buildings and 500 Villas with various Architectural Types.
- Utilities & site development works that Includes Road Works, Water Supply, Sewage System, Power Distribution System and Telephone Networks.
- Construction of El Rehab Shopping Mall 1 & Club.
Completed
Read MoreTBL And Apron Commercial Exploitation for Alexandria International irport (Nozha Airport)
The scope of work includes repair works and raising efficiency for old existing building with total BUA 4000 Sqm. consists of 3 floors, with construction of new concrete one floor building as an extension of old one.
Completed
Read MoreAl Rehab Shopping Mall
Construction of Al Rehab shopping mall 1 consisting of shops, cinemas and restaurants